Mine Commissioning, Turnover and Sustaining Capital

Commissioning is where mining projects most commonly lose time and money in the final phase. Turnover packages are incomplete, punch lists are poorly managed and the handover from construction to operations is poorly planned.

Praetorian manages commissioning and turnover as an integrated phase of the project, not an afterthought, so the owner takes possession of a fully functional facility on the agreed date, ready for first production.

Speak with Our Team
When to engage us

When owners bring Praetorian in

Owners usually bring Praetorian in:

  • At the start of execution, to set commissioning requirements and track turnover package completion throughout construction.
  • As construction nears completion, to verify mechanical completion system by system and manage punch lists, pre-commissioning, commissioning and turnover.
  • After first production, to support ramp-up to nameplate capacity and further improvement and capital projects on the operating site.

How it works alongside the construction and commissioning teams

Praetorian works system by system against approved completion databases, so no system is handed to commissioning until it meets the agreed mechanical completion criteria. We coordinate vendor representatives, manage cold and hot commissioning, and prepare turnover packages with as-built drawings, equipment manuals, inspection records and training materials.

Independent construction verification, including inspection plan reviews, hold point witnessing and non-conformance management, gives the owner objective assurance that what was built matches the approved design.

Sustaining capital and improvement projects

Praetorian's support does not have to end at handover. At Wesdome's Kiena Mine, Praetorian continued after the paste plant was completed, supporting further improvements to the plant and additional capital projects on site. Owners can bring the same owner's team discipline in project controls, contracts and construction management to sustaining capital work on an operating mine.

What's included

Services included

Systematic handover from construction to operations, ensuring readiness for first production.

Construction Verification

Independent verification that construction proceeds in accordance with approved designs, specifications, and quality requirements. Praetorian provides the owner with objective assurance through inspection plan reviews, hold point witness, non-conformance management, and as-built verification.

Pre-Commissioning

Mechanical completion verification, punch list development and closure, loop checking, instrument calibration, and equipment alignment checks. Praetorian works system by system against approved completion databases, ensuring no system is handed to commissioning until it meets agreed mechanical completion criteria.

Commissioning

Systematic introduction of process fluids, energisation of electrical systems, and initial operation of process circuits under controlled conditions. Praetorian manages cold and hot commissioning phases, vendor representative coordination, performance testing, and issue resolution.

Turnover

Formal transfer of systems and the complete facility from the construction and commissioning team to the owner's operations team. Praetorian prepares turnover packages including as-built drawings, equipment manuals, inspection records, training materials, and confirmation that all spares are procured.

Ramp Up

Owner-side support from first production through to achieving nameplate capacity. Praetorian helps operations teams identify and resolve bottlenecks, manage contractor defect rectification, and optimise process performance against the design basis.

Project experience

Where Praetorian has delivered this service

Gold · Ontario, Canada

IAMGOLD Cote Gold Project

Punch list and turnover supervision and commissioning support across the processing plant and facilities.

View project
Gold · Quebec, Canada

Wesdome Kiena Paste Plant

Coordination of commissioning deliverables, then continued support for paste plant improvements and additional capital projects on site.

View project
Gold · Armenia

Lydian Amulsar Gold Project

Pre-commissioning and operations preparation support.

View project
Common questions

Questions owners ask

What is the difference between pre-commissioning and commissioning?

Pre-commissioning confirms that each system is mechanically complete: punch lists closed, loops checked, instruments calibrated and equipment aligned. Commissioning then introduces process fluids, energizes electrical systems and runs process circuits under controlled conditions, through cold and hot commissioning and performance testing.

What should a turnover package include?

As-built drawings, equipment manuals, inspection records, training materials and confirmation that all spares are procured, for each system and for the complete facility.

When should commissioning planning start?

At the start of execution. Praetorian sets commissioning requirements early and tracks turnover package completion throughout construction, rather than leaving it to the final weeks.

Does Praetorian support sustaining capital projects on operating mines?

Yes. At the Kiena Mine, for example, Praetorian continued after project completion, supporting further improvements to the paste plant and additional capital projects on site.

Further reading
Other services

Ready to discuss your project?

Praetorian embeds directly into your ownership team, from early feasibility through final commissioning.

Let us talk about what that looks like for your project.

Speak with Our Team